CIVORA · Design slope

Slope & offset

Enter the crest level, the toe level and the design slope. The horizontal offset, slope length and the level at any point on the batter update as you type.

Design levels


Design slope


Point on the batter

Cross-section, vertical scale exaggerated to fit.
CIVORA · Slope transition

Slope transition

Toe offset, toe coordinates and elevations along a curved crest line, with slope-ratio transitions between control points. Load a crest line CSV, set the control points and export the setting-out schedule.

Open full screen

Slope converter

Type into any field and the others follow. Use this to move between drawing ratios, percent grades and angles.

Reference

Gradient g
g = V ÷ H = tan θ
Percent
% = g × 100
Angle
θ = atan(g) · 180/π
Ratio 1V : nH
n = 1 ÷ g = H ÷ V
Per mille
‰ = g × 1000
Slope length
L = √(H² + V²) = H ÷ cos θ
Common batter%Angle °Gradient

Coordinates

Grid bearings are measured clockwise from grid north. Angles accept decimal degrees or d m s, for example 121 56 30.32.


Set out a point


Check a point

Plan view. Right is to the right when looking from start to end.

Grade profile

Straight-grade levels between two points, split into equal segments or a fixed interval. Copy the table straight into Excel or a CAD script.



Long section, vertical scale exaggerated.
#ChainageDistanceLevel
CIVORA · Survey planning

Survey time estimate

Plan line coverage, survey distance and duration for a swath survey. Every input updates the line count, line kilometres, vessel time and the overlap comparison at once.

Survey area


Coverage


Cross lines


Vessel and line changes


Working pattern and allowances


Transit and mobilisation

Across-track section of two adjacent lines.
Plan of the survey area.

Overlap comparison

Same area, speed and allowances, with only the overlap changed.

OverlapSpacing mLinesSurvey kmOnline hTotal hDaysDurationvs current
Survey days by overlap. The current overlap is highlighted.

Operational allowance

Planning ranges on top of the estimate above, for budgeting vessel time.

ScenarioHoursDaysDuration

Trigonometry

Solve any right-angled or oblique triangle from the values you know. Every result shows the formula used.

θ sits between the adjacent side and the hypotenuse.

Side a is opposite angle A, b opposite B, c opposite C.

Drawn to scale.
SOH
sin θ = Opposite ÷ Hypotenuse
CAH
cos θ = Adjacent ÷ Hypotenuse
TOA
tan θ = Opposite ÷ Adjacent
Pythagoras
c² = a² + b²
Sine rule
a ÷ sin A = b ÷ sin B = c ÷ sin C
Cosine rule
a² = b² + c² − 2bc·cos A
Area
½·a·b·sin C, or Heron: √(s(s−a)(s−b)(s−c))
Angle sum
A + B + C = 180°
Reciprocals
cosec = 1/sin, sec = 1/cos, cot = 1/tan
Identity
sin²θ + cos²θ = 1
Degrees to radians
rad = deg × π ÷ 180
Slope link
tan θ = V ÷ H, so 1:15 → θ = 3.814°

Function calculator

Chainage labels

Builds one AutoCAD / BricsCAD -TEXT command per chainage. Paste into the command line or save as a .scr and run with SCRIPT.


About

CIVORA

Civil Infrastructure, Volume, Offshore & Reclamation Analytics. A free set of design calculators for engineers, surveyors and data processors working on marine, dredging, reclamation and civil infrastructure projects.

What it does

CIVORA turns the everyday hand calculations of design and survey work into live tools. Change any input and every result, drawing and formula updates at once, so you can check a batter, set out a point or label a long section in seconds.

Slope & offset
Toe offset, slope-face length, level at any distance and distance to any level.
Slope transition
Toe offsets, coordinates and levels along a curved crest with slope transitions.
Slope converter
Percent, degrees, d m s, 1V:nH ratios, per mille and radians.
Coordinates
Bearing and distance, inverse, and chainage-offset setting-out.
Survey time
Beam angle coverage, line spacing, line count, survey kilometres and vessel days, with overlap comparison.
Grade profile
Interpolated levels by segments or interval, ready for Excel.
Trigonometry
Right and oblique triangle solvers with every formula shown.
Chainage labels
AutoCAD / BricsCAD -TEXT scripts for long-section labelling.

Method and good practice

All results are computed in your browser. No data is uploaded or stored on a server. Bearings are grid bearings clockwise from north. Slopes are straight grades between two levels, and triangle solutions use the sine and cosine rules.

Always check critical design values independently before issue. CIVORA is a calculation aid and does not replace project specifications, design reviews or professional sign-off.