Slope & offset
Enter the crest level, the toe level and the design slope. The horizontal offset, slope length and the level at any point on the batter update as you type.
Design levels
Design slope
Point on the batter
Slope transition
Toe offset, toe coordinates and elevations along a curved crest line, with slope-ratio transitions between control points. Load a crest line CSV, set the control points and export the setting-out schedule.
Slope converter
Type into any field and the others follow. Use this to move between drawing ratios, percent grades and angles.
Reference
g = V ÷ H = tan θ
% = g × 100
θ = atan(g) · 180/π
n = 1 ÷ g = H ÷ V
‰ = g × 1000
L = √(H² + V²) = H ÷ cos θ
| Common batter | % | Angle ° | Gradient |
|---|
Coordinates
Grid bearings are measured clockwise from grid north. Angles accept decimal degrees or d m s, for example 121 56 30.32.
Set out a point
Check a point
Grade profile
Straight-grade levels between two points, split into equal segments or a fixed interval. Copy the table straight into Excel or a CAD script.
| # | Chainage | Distance | Level |
|---|
Survey time estimate
Plan line coverage, survey distance and duration for a swath survey. Every input updates the line count, line kilometres, vessel time and the overlap comparison at once.
Survey area
Coverage
Cross lines
Vessel and line changes
Working pattern and allowances
Transit and mobilisation
Overlap comparison
Same area, speed and allowances, with only the overlap changed.
| Overlap | Spacing m | Lines | Survey km | Online h | Total h | Days | Duration | vs current |
|---|
Operational allowance
Planning ranges on top of the estimate above, for budgeting vessel time.
| Scenario | Hours | Days | Duration |
|---|
Trigonometry
Solve any right-angled or oblique triangle from the values you know. Every result shows the formula used.
Side a is opposite angle A, b opposite B, c opposite C.
sin θ = Opposite ÷ Hypotenuse
cos θ = Adjacent ÷ Hypotenuse
tan θ = Opposite ÷ Adjacent
c² = a² + b²
a ÷ sin A = b ÷ sin B = c ÷ sin C
a² = b² + c² − 2bc·cos A
½·a·b·sin C, or Heron: √(s(s−a)(s−b)(s−c))
A + B + C = 180°
cosec = 1/sin, sec = 1/cos, cot = 1/tan
sin²θ + cos²θ = 1
rad = deg × π ÷ 180
tan θ = V ÷ H, so 1:15 → θ = 3.814°
Function calculator
Chainage labels
Builds one AutoCAD / BricsCAD -TEXT command per chainage. Paste into the command line or save as a .scr and run with SCRIPT.
CIVORA
Civil Infrastructure, Volume, Offshore & Reclamation Analytics. A free set of design calculators for engineers, surveyors and data processors working on marine, dredging, reclamation and civil infrastructure projects.
What it does
CIVORA turns the everyday hand calculations of design and survey work into live tools. Change any input and every result, drawing and formula updates at once, so you can check a batter, set out a point or label a long section in seconds.
Toe offset, slope-face length, level at any distance and distance to any level.
Toe offsets, coordinates and levels along a curved crest with slope transitions.
Percent, degrees, d m s, 1V:nH ratios, per mille and radians.
Bearing and distance, inverse, and chainage-offset setting-out.
Beam angle coverage, line spacing, line count, survey kilometres and vessel days, with overlap comparison.
Interpolated levels by segments or interval, ready for Excel.
Right and oblique triangle solvers with every formula shown.
AutoCAD / BricsCAD -TEXT scripts for long-section labelling.
Method and good practice
All results are computed in your browser. No data is uploaded or stored on a server. Bearings are grid bearings clockwise from north. Slopes are straight grades between two levels, and triangle solutions use the sine and cosine rules.
Always check critical design values independently before issue. CIVORA is a calculation aid and does not replace project specifications, design reviews or professional sign-off.